Abstract

The construction techniques and anchoring mechanism of pre-anchoring fissured stope hangingwall of some copper mine in China by fully-grouted cable bolts are explored. The construction stages such as drilling anchor holes, making anchorage cables and cement mortar, grouting, and curing are expounded. A combined action mechanism of pre-anchoring fissured stope hangingwall by fully-grouted cable bolts is presented. The achievements are helpful and beneficial to the design and construction of rock engineering projects which need anchoring reinforcement, such as slopes, tunnels, deep foundation pit, caverns, and underground mining.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.