Abstract

Subway shield lining segments are highly sensitive to peripheral soil disturbance. Shield displacement may destroy the whole structure which can not be repaired, and directly affects the subway operation safety at the worst. Therefore, it is necessary to reasonably determine the construction technology, in order to avoid the unfavorable influences caused by construction disturbance. According to the pile-board subgrade scheme which is adopted by the comparison of schemes, also considering the high risk of over-shallow-embedded metro construction, we put forward the key construction technique of pile-board subgrade, including: technique of casing tube bored pile, construction process of pile-board structure and monitoring of settlement and deformation which are important to guide the similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.