Abstract

The UK's construction industry is witnessing an annual increase in costs due to a lack of communication between the different organizational operators on the construction site that often leads to construction defects. Meanwhile, a cost-reduction strategy plan using BIM has become a fundamental requirement for the government, aiming to keep costs under control. To facilitate BIM adoption in the industry, the BIM strategy was introduced in four phases, with each stage entailing a number of criteria. The industry has seen a global reaction to the Level 2 BIM program and a significant cost saving of 840M in 2013/14 in Europe. However, the industry is unable to match the level 3 BIM, where a collaborative model file server is required as a common sharable platform to achieve efficient communication. This study contributes toward formulating a communication framework in the UK industry to understand communication issues and manage defects. A survey was targeted at construction industry practitioners and academics, with a total number of 328 participants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call