Abstract

AbstractConstruction simulation is an effective means to describe the dam filling process of a core rockfill dam. However, present research studies adopt a simplified method to analyze the placement of a rockfill subsystem because of various uncertain working constraints and diverse flow shop construction processes, which include preparing, discharging, paving, compacting, and checking. In addition, because the time and cost minimization and equilibrium of the filling intensity are important matters in the design of core rockfill dam construction stages and zones, full consideration of these matters is required during the construction process. In this work, a construction simulation model for a rockfill dam based on flow shop construction is presented. The model can provide different reasonable construction schemes of each filling layer. In addition, to obtain an optimal plan for the construction stages and zones, entropy weight method and the improved genetic algorithm (GA) are used to address the time-c...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call