Abstract

Underground cavities have complex spatial structures and geological settings, their arrangement is dense and crisscrossed. The construction system involves multiple work surfaces, levels, and processes. The close integration of construction simulation with actual production conditions is crucial for enhancing the guidance that simulation results provide for practical engineering. Therefore, from the perspective of optimizing construction organization and management, this article comprehensively considers various factors in the construction process, innovatively introduces the principle of production line balance and the concept of rule cycle, and combines technology and management, an underground cavities construction simulation system (UCCSS) is developed. In UCCSS, a hierarchical model is built and calculation are performed on models with different construction methods by modifying the parameters as per the actual engineering characteristics. The simulation results are comprehensively analysed to determine the optimal construction programme. An application case is proposed based on the construction organisation design of the long and parallel diversion tunnels at the CB Hydropower Station. The results show that the system has good practicality and credibility and can provide guidance for the construction organisation design of underground cavities with various features.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.