Abstract

Underground powerhouse of hydraulic and hydroelectric engineering is a large cavern group structure. Construction process of underground powerhouse is a complex system, whose construction schedule is associated with construction quality. It is necessary to arrange construction schedule adopting construction simulation method and combining with tunnel stability analysis, which can advance the level of construction organization design. By using real-time control theory and methodology, the real-time control model of construction schedule and quality was established, considering construction procedure, geological conditions and resource limitation. The real-time control method of construction schedule and quality was presented, and the practical control procedure was studied. Good effect is obtained through the application of the real-time control method for construction schedule and quality in one real underground powerhouse.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.