Abstract

Engineering bridge construction is a very complicated system work. The potential risk would occur frequently in the process from construction preparation to completion. The bridgework has fundamental features in huge investment, complex technology, broad engineering, long project life cycle and big impact if an accident happened. Compared to other highway construction process,there are more risks in the process of the bridgework. According to the method of steel tube concrete composite column bridge pier construction on bridge engineering, this thesis identifies the bigger risk factors in the procedure with the analytic hierarchy process. Combined with the technology of the MIDAS/CIVIL and imitating upper structure construction of actual construction process, it quantificationally analyses the construction risk. This could be for the reference to risk analysis on bridge project construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.