Abstract

This paper describes a new perspective to consider and quantify uncertainty in construction schedules. In the study, a methodology was presented by modeling construction project scheduling using event chains, classification of the events and event chains, identification of critical events, analysis of effect of the events on project duration, and chance of project completion. To demonstrate the applicability and effectiveness of the proposed methodology, a real airport terminal example is provided. Moreover, schedule risk analysis system and risk break down structure are also developed as an essential part.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.