Abstract

A method is proposed for planning the construction process for a linear project consisting of a series of production lines, each of which comprises a series of sequential activities (e.g., pipelines, roads, bridges, etc.). The method is based on an input including labor requirement for each activity and the feasible crew sizes for each production line. Dynamic programming is used for determination of the quantity of resources (therefore also activity durations) per line and the start time of each activity, with a view to work continuity within the line and to minimum overall project duration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.