Abstract
Major geotechnical issues related with tunnel construction phases are addressed. Focusing on an excavation scenario with reinforced concrete retaining walls in prevailing clayey soils, locally including sandy and silty-sandy layers, this study explores both drained and undrained conditions and considers various boundary conditions. Using the Finite Element (FE) method, a construction stage analysis of a tunnel located in the alluvial deposits of the Po Plain (northern Italy) in an urban area is carried out. This tunnel will serve the burying works of the Ferrara-Codigoro railway line, which are still underway. Based on hydrogeological conditions, the developed models take alternatively account of: (1) drained conditions with horizontal water table; (2) drained conditions with sloping water table (due to differences in water table depth between tunnel location and surrounding territories), and (3) undrained conditions with horizontal water table. Further complexity is introduced by incorporating buildings with either rigid or deformable foundations into the FE model. The fundamental role played by the boundary conditions is emphasized. Therefore, a detailed understanding of the exact sequence of construction phases and a good knowledge of the subsoil hydrogeological conditions result to be of utmost importance to capture induced settlements.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.