Abstract

The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What’s more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.