Abstract

This paper illustrates the final design development and the construction engineering of a cable-stayed bridge of recent construction, which crosses the commercial harbour of Venice.The bridge presents a curved deck, steel-concrete composite structure, single layer of stay cables displayed on a conical layout, and a slanted single lateral mast.The construction method was based on the erection of the deck structure by floating and lifting of large macro-elements. The girder system was designed according to the concept of deck structure protected by a stainless steel enclosure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.