Abstract

We have constructed and completed the preparation for a long-term operation test of a superconducting fault current limiter (SFCL) in a Korea Electric Power Corporation (KEPCO) test grid. The SFCL with rating of 22.9kV/630A, 3-phases, has been connected to the 22.9kV test grid equipped with reclosers and other protection devices in Gochang Power Testing Center of KEPCO. The main goals of the test are the verification of SFCL performance and protection coordination studies. A line-commutation type SFCL was fabricated and installed for this project, and the superconducting components were cooled by a cryo-cooler to 77K in the sub-cooled liquid nitrogen pressurized by 3bar of helium gas. The verification test includes un-manned – long-term operation with and without loads and fault tests. Since the test site is 170km away from the laboratory, we will adopt the un-manned operation with real-time remote monitoring and controlling using high speed internet. For the fault tests, we will apply fault currents up to around 8kArms to the SFCL using an artificial fault generator. The fault tests may allow us not only to confirm the current limiting capability of the SFCL, but also to adjust the SFCL – recloser coordination such as resetting over-current relay parameters. This paper describes the construction of the testing facilities and discusses the plans for the verification tests.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.