Abstract

In this paper ,the axes of a three-span dumbbell-shaped steel tube concrete arch bridge was changed due to deviation in bridge piers, tie beam construction and steel tube production, thereby steel tube arch ring can not be closed, and suspender hole can not be aligned. The side-span hollow steel tubes were intercepted and adjusted for three times through calculation and analysis, therefore the structure stress is reasonable and achieved original design standards under the condition of not changing the original arch axes, and the bridge was successfully constructed, thereby providing reference for engineering staff.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.