Abstract

Purpose – The purpose of this paper is to build and provide a step-by-step methodology to develop a speed-to-market (STM) process model for a fashion garment that can quickly respond to the marketing situation and shorten the cycle time from receiving orders to deliver the finished product. The improved STM process model to contrast the “before” and “after” scenarios in order to induce potential benefits such as reducing production lead-time and keeping low inventory. Design/methodology/approach – First, collected garment business management systems and garment manufacture operational process. Second, according to the point-line-plane-volume work improvement to list the garment industry up and down stream improvement projects and to reduce the supply chain lead-time. Third, establish the STM model and use information technology to redesign the garment industry supply chain process. Fourth, amend the STM model process. Fifth, compare the supply chain lead-time of finished STM process and normal process. Findings – After the garment industry implements STM and supply chain re-engineering, the clothing design to sale process can be simplified and reduced time to market. The garment order to buyer lead-time is shortened from 104 to 42 days totally. Practical implications – This research is a practical business re-engineering process and work improvement. The improvement STM model can half the cycle time from receiving orders to deliver the finished garment product. Originality/value – This paper provides a process with a step-by-step methodology to develop a successful speed-to-market model for the fashion garment industry and it is able to serve as a reference model for other industrial supply chain management.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call