Abstract

In an age where every square millimetre has the potential to earn money, it is essential to maximize the floor spacein today’s property developments and the extend goes to the record-breaking basements too. While this may seemlike another difficult demand for those involved in such projects, but our believe is that bar can be raised traditional,buildings with underground basements are built by Bottom-up method where sub-structure and super- structurefloors are constructed in a sequence from the bottom of the sub structure to the top of the super-structure. Thoughthis traditional method is simple in both design and construction, it is not feasible for the huge projects with limitedconstruction time. So to counter this we have come up with top down construction as in the deepest undergroundstation in New Delhi, India at Hauzkhas. Top-down construction method as the name implies, is a constructionmethod, which builds the permanent structure members of the basement along with the excavation from the top tothe bottom. This construction method, which provides us with saving of the overall construction time, it is showingincreasing adoption for major projects where time factor is of primary importance. But this method wouldn’t bepossible without the help of the plunge columns that acts as a vertebra to this technique, which helps in holding allthe loads that is laid during the process. A plunge column is a structural steel or concrete section embedded in afreshly poured concrete pile, eliminating the need for base plates and holding-down bolts. Plunge columns can beinstalled into rotary bored piles to allow for a ‘top-down’ construction sequence; 'launching' the structures muchbefore the basement is excavated. By adopting this method of construction the client can gain advantage of areduced construction programme.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call