Abstract

The construction of high-rise buildings on plate foundation in geotechnical conditions of the Russian Far East is a complicated problem. In this respect foundation engineering becomes rather essential. In order to set a firm foundation it is necessary to take into account the pressure distribution at the structure base, in homogeneity of building deformation, which is due to collaborative geotechnical calculations complicated by a number of factors: actual over-placement of soils, the complex geometry of the building under construction, spatial work of the foundation ground with consideration for physical nonlinearity, the influence of the stiffness of the superstructure (reinforced concrete framing) upon the development of foundation deformations, foundation performance (the performance of the bed plate under the building and stairwells), the origination of internal forces in the superstructure with differential settlement. The solution of spatial problems regarding the mutual interaction between buildings and foundations with account of the factors mentioned above is fully achievable via the application of numerical modeling methodology. The work makes a review of the results of high-rise plate building numerical modeling in geotechnical conditions of the Russian Far East by way of the example of Khabarovsk city.

Highlights

  • Year by year the problem of getting new construction areas in megapolises and big cities is becoming more and more complicated because of the fact that the land price is very high

  • The construction of high-storey buildings in the field of residential real estate reduces the price for a land square meter and makes it possible to decrease the price for ready housing constructions

  • The conducted explorations of the stress strain behavior of foundation plate of high-storey buildings have shown the possibility to use this particular type of underground constructions for building in engineering-geological conditions of Khabarovsk

Read more

Summary

Introduction

Year by year the problem of getting new construction areas in megapolises and big cities is becoming more and more complicated because of the fact that the land price is very high To solve this problem we have to get the max square meters quantity from each land area by means of increasing the storey number of a building. The building-up of high-storey building on plate foundation constructions in engineeringgeological conditions of Khabarovsk is a complicated geotechnical goal and it is acceptable only if there is special geotechnical ground for it. In connection with this the installation of safe foundation and base is quite urgent

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call