Abstract
To ensure the safe and stable operation of the power system in the power market environment, a transaction model of power reserve ancillary services oriented to interruptible loads is constructed. By analyzing the benefits of interruptible users and power grid enterprises, a transaction model of interruptible load is established based on it. After obtaining the value of the minimum cost of power system to purchase interruptible load, the capacity cost, opportunity cost and standby use cost of power reserve are calculated respectively. The objective function of auxiliary power reserve service transaction model with interruptible load is established and the constraint conditions are set, and then the transaction result of auxiliary power reserve service is obtained by solving the objective function of the model. The experimental results show that the model can effectively calculate the power interruption compensation price of user interruptible load, and obtain the interruptible load transaction results according to the rapid capacity quotation, power quotation, etc. At the same time, the model has the lowest cost of reserve capacity and reserve use cost in a certain period of time, and the application effect is good.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.