Abstract
The erection of horizontally curved steel I-girder bridges tends to be more complex than the erection of straight steel I-girder bridges. The erection of a curved steel I-girder bridge can be further complicated when the cross-frame members and girders are detailed inconsistently in an effort to force bridge components into some desirable geometric condition. Inconsistent detailing involves the intentional specification of cross-frame members that are either too long or too short to align with girder connector plates properly so as to force the girders into a given position, resulting in connection misalignments that must be resolved by applying external forces to the bridge components. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge and highlights the fact that practice of inconsistent detailing can lead to very formidable and costly fit-up problems in the field; especially when girder sizes are large.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.