Abstract

Constraining factors for the development of traditional solutions for the development of hard-to-reach logging areas are given. Mathematical and software methods are proposed to calculate the construction of routes for rope-trailer installations. Methods of solving the problem of laying an acceptable optimal route using discrete programming methods under conditions of risk and uncertainty are proposed. On a practical example in typical natural and industrial conditions of the North-West Federal District of the Russian Federation (sq.4 v.39 of the Primorsky district forestry of the Kurortny forestry of St. Petersburg) the construction of a mathematical model for solving the stochastic problem with quantile indices is carried out.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call