Abstract

To ensure the structural safety and normal operation of a cable-stayed bridge in China (Rainbow Bridge), cables were replaced and construction monitoring and control were conducted. In the process of cable replacements, the cable force and girder elevation were monitored and the distribution of cable force was adjusted according to the construction monitoring results to improve the structural force and increase the safety reserve of the structure. In the process of monitoring the cable force, the difference between the measured cable force and the design cable force was 0.4–4.4%. After adjusting the cable force, the difference between the measured cable force and the design cable force was less than 2%, and the change in the cable force was uniform, meeting the original design requirements. In the monitoring process of the main girder elevation, the elevation was increased by a maximum of 0.054 m. After completing cable adjustment, the main girder elevation was increased by 0–5 mm. This elevation was more reasonable and met the design requirements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.