Abstract

Part 1. Factors Affecting Construction Method Assessment 1. Site Inspections 2. The Influence of the Site and its Boundaries on Plant and Method Selection 3. Temporary Works: Scaffolding, Formwork and Falsework, Support of Excavations 4. Influence of Design on Construction Cost Part 2. Establishing Methods and their Planning Control 7. Non-piled Foundations 8. Piled Foundation 9. Deep Basements 10. In-situ Concrete Structures 11. Pre-cast Concrete Structures 12. Steel Structures 13. Cladding, Internal Works and Specialist Services 14. External Works 15. Waste in the Construction Process 16. Method Statements 17. Contract Planning Control on Site 18. The Role of Planning in Claims 19. Facade Retention and Structural Alteration 20. Refurbishment of Housing.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.