Abstract

The work presented in this paper includes the construction methods and lessons learned from the placement of a non-proprietary ultra-high performance concrete (UHPC) overlay through the rehabilitation of a concrete bridge deck located in Socorro, New Mexico, USA. The selected bridge is a multi-cell, box girder bridge with four spans and a total length of 91.4 m and a width of 16.5 m with two traffic lanes. Rehabilitation of the bridge involved removing the top surface of the existing deck (deteriorated concrete), installing a high-performance deck (HPD) leveling course, and placing a 25 mm UHPC overlay. Sensors were installed in the bridge superstructure (multi-cell box girders, HPD, and overlay) for long-term monitoring. Overlay assessment included physical testing to evaluate the condition of the overlay–substrate bond by chain dragging and direct tension pull-off testing. Conclusions and lessons learned from this investigation serve as a fundamental list of best practices and recommendations for field construction of a non-proprietary UHPC overlay. Recommendations for preparatory tasks including material selection, substrate surface preparation, placement preparation, handling of materials, and UHPC mixing are provided. The recommendations also list best practices concerning the placement of the overlay, curing procedures, and quality assurance testing. Lastly, suggestions are presented for contracts pertaining to UHPC overlay projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.