Abstract

This paper introduced construction method for deep pile of Zishui bridge through karst region and the checking results of the pile bearing capacity. Firstly, main structure of Zishui bridge was simply introduced. Secondly, according to the special geological conditions, construction methods for bored piles in water and drilling platform were described. The discussion focused on the problem of boring and grouting in karst foundation and their solutions. Finally, to ensure that the pile capacity can meet the design requirements, load transfer method was used on the part of pile foundation to calculate the bearing capacity. Results showed that pile bearing capacity meet the requirements, and the feasibility and correctness of construction method of Zishui bridge was also verified,which provides references for the design and construction of the same civil engineering.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.