Abstract

Generation projects are generally located in areas nearer to availability of inputs required for power generation such as water, coal, approach roads and having rail transport facilities. The load centers are at different locations depending its own convenience load requirement. Hence there is necessity of transmission of bulk power from generation sites to load or consumer points. Hence the utility of power transmission through EHV/UHV transmission lines. Further for transmission of bulk power from one region of country to another region also warrants establishment of Transmission lines. The technical as well as social and commercial criteria are very important while construction and erection of EHV and UHV transmission lines. These issues are of public as well as organization importance and hence efforts have been made in this presentation to elaborate in detail.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.