Abstract
Innovations in construction of a large concrete gravity dam include underground crushing chamber, multiple parallel track cableways, long span luffing cableway, conveyor placement of concrete, water reducing admixture, self-raising forms, precast galleries, sloping stationary and slip forms, testing of horizontal construction joint treatment and concrete placement methods, two-way flow control for concrete after-cooling and repair of diversion channel while passing full river flow. Short descriptions are given as an aid in solving future construction problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.