Abstract

Fermilab is building eighteen full length cold masses for the LHC Interaction Region inner triplets. One prototype and several production assemblies have been completed. This paper summarizes the construction details. Topics include coil fabrication, ground insulation, collaring, instrumentation, electrical testing, and final assembly. In-process measurements are presented and explained. Problems encountered during construction and their solutions are discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.