Abstract

Estimating equipment production rates is both an art and a science. An accurate prediction of the productivity of earthmoving equipment is critical for accurate construction planning and project control. Owing to the unique work requirements and changeable environment of each construction project, the influences of job and management factors on operation productivity are often very complex. Hence, construction productivity estimation, even for an operation with well‐known equipment and work methods, can be challenging. This study develops and compares two methods for estimating construction productivity of dozer operations (the transformed regression analysis, and a non‐linear analysis using neural network model). It is the hypothesis of this study that the proposed neural networks model may improve productivity estimation models because of the neural network's inherent ability to capture non‐linearity and the complexity of the changeable environment of each construction project. The comparison of results suggests that the non‐linear artificial neural network (ANN) has the potential to improve the equipment productivity estimation model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.