Abstract
When the continuous rigid frame bridge's actual closure temperature is higher than the design closure temperature, the closure temperature's difference will cause horizontal displacement at top of pier, and cause the structure to have the temperature intennal force. A horizontal jacking force is exerted to eliminate the adverse effect of closure temperature's difference. One calculating method of jacking force is proposed in this paper: Eliminating the horizontal displacement at top of pier method. Taking the Longtan River Bridge as a practice example, the high closure temperature's horizontal jacking force is calculated according to the method separately in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.