Abstract

According to the permanent and temporary monitoring results, the warning boundary method and the mathematical physical model method are used for early warning and forecasting, and the construction measures are dynamically adjusted to form a construction control method based on safety monitoring technology. The application of the method which combines permanent monitoring with temporary monitoring on the front slope of the tail water outlet of the left bank, the upstream side wall of the 7#∼8# machine on the right bank, and the downstream abutment of the 9#∼10# unit section of Wudongde Hydropower Station, shows that it can fully grasp the stability of surrounding rock during construction period of slope and underground caverns. Through the early warning and forecasting, the mechanism of deformation is analyzed, the construction measures are adjusted in time, and the effect of the measures is evaluated, which plays an important role in ensuring the safety of the construction period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.