Abstract

The most difficult and constructionally complex reinforced-concrete elements of the internal passages of the units at the Kanevsk hydroelectric plant, which required an especially careful finishing of the frontal surfaces, were constructed by applying a highly rational method and with a minimum labor consumption, For further improvement of the adopted method of constructing hydraulic structures, it is necessary to determine more carefully the optimal weight of the truss units in order to reduce the cost of the crane time required for their installation, especially in vertical structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.