Abstract

In Brazil, municipal public authorities are responsible for construction and demolition (C&D) waste management. However, there is a lack of specialized personnel and financial resources that jeopardize the implementation of adequate C&D waste management practices. The main objective of this article is to present a framework developed with the purpose of modeling the C&D municipal waste management processes. First, through a literature review, the following were identified: the functions and the logic flow of the C&D waste management processes, and activities carried out from waste generation to its final disposal. The scope of the modeling cycle includes six processes: waste generation, collection/transport, inspection, recycling, reuse, and final disposal. Through the framework application, it is possible to identify the processes developed in C&D waste management (As–Is modeling), and the deficiencies and improvements necessary to enhance the entire system (To–Be modeling). The framework could be used as a tool to increase productivity, recycling rate, and improve the quality of recycled products, which are the key elements towards the integration of waste management and circular economy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.