Abstract

Hydrogen isotopes from the Water Detritiation System (WDS) developed at the Tritium Laboratory Karlsruhe (TLK) are fed to a cryogenic distillation (CD) column. In order to purify this gas a permeator of 1 m 2 membrane area was found to be necessary. Technical requirements, regulations of the European Union and the TLK safety philosophy demanded that the component had to be designed and manufactured in accordance to the “Technical Terms of Delivery and Acceptance” for tritium primary systems in the Tritium Laboratory Karlsruhe and in conformity to the European Pressure Equipment Directive (PED). Since there was no response to the call for tender from industrial partners, the permeator was manufactured at the main workshop of the Forschungszentrum Karlsruhe (FZK). Acceptance tests and commissioning showed that the component performance is better than design requirements. This paper describes the construction and commissioning of the permeator and gives the results of the commissioning tests.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.