Abstract

Hokuriku Electric Power Co. is currently constructing Shika Nuclear Power Plant Unit No. 2 in order to start commercial operation in March 2006. The intake and discharge water will be via undersea tunnel, as well as Unit No. 1, in order to minimize environmental impact. Various techniques such as shield tunneling, NATM and semi-shield method was adapted to excavate large diameter rock tunnel under high water pressure. This article deals with such various techniques and achievements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.