Abstract

Severn Trent Water is required to treat stormwater overflows that occur at sewage treatment works before discharge to receiving water courses. Where the regulator sets numeric quality standards on stormwater discharges from works serving populations of <2 000, treatment is provided in constructed reed beds. By June 1994 the company had 55 sites with reed beds for stormwater treatment and expects to provide more as an asset renewal programme continues. The paper describes discharge consent issues that are emerging and details the operation of the reed bed systems. Results from three surveys carried out during storm events show the benefit of the systems in reducing discharges of BOD5, TSS, ammonia N, and TON. A tracer study was carried out on one survey and the results are fitted to a simple mathematical model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.