Abstract

The writers formulated a case study of the Kuala Selangor Cable Stayed Bridge to examine the application of the constructability concepts particularly during the conceptual planning and the design phases of the project. This paper presents the advantages of implementing the constructability concepts and the barriers that were encountered when applying these concepts during the planning and design phases of the cable stayed bridge project of Kuala Selangor in Malaysia. The writers concluded that barriers to constructability implementation that are related to the owner were the major impediments in the application of constructability concepts during the early conceptual planning phase. The opinion of the engineer was another factor behind nonapplication of some other concepts. At the same time, many others were implemented due to the awareness and opinion of the engineer and his ability to control their application.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.