Abstract

Real applications in shift scheduling often require handling rules such as multiple breaks, flexible shift lengths, overtime, multiple activities, among others. Because these rules demand a high level of flexibility, we model the problem as a Multi-Activity Shift Scheduling Problem (MASSP), where multiple activities can be scheduled in a shift. To solve the MASSP, we propose a column generation-based approach. The auxiliary problem is modeled as a Shortest Path Problem with Resource Constraints (SPPRC), where most difficult constraints are embedded in the underlying graph. To illustrate the solution approach, we present our experience solving a real-world problem from a large parking lot operator that schedules security staff and cashiers among several parking lots in Bogotá (Colombia). The results show a significant reduction on the staffing total costs and on man-hours used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.