Abstract

In this paper, undisturbed specimen of a silty clay constituting of Phu Bai formation (ambQ21-2 pb) was collected from boreholes in Hue city and surrounding areas. The soil, under both undisturbed and disturbed conditions, was then subjected to standard one-dimensional consolidation tests with 7 loading increments. It is shown from the experimental results that the time to the end of primary consolidation (EOP), determined by Log Time method (tLT) and 3-t method (t3T), decreases with the load increment and under the same vertical stress, the primary consolidation of disturbed silty clay finish at a shorter time than those of the undisturbed one. The coefficient of secondary consolidation (Cα) increases with the vertical stress and reaches the maximum values before decreasing. The obtained values of Cα = 0.005 - 0.020 suggest a relatively low secondary compressibility of the silty clay constituting of Phu Bai formation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.