Abstract

The Brazilian Power System is mainly composed of renewable generation from hydroelectric and wind. Hence, spot and forward electricity prices tend to represent the inherently stochastic nature of these resources, while risk management is a measure taken by agents, especially hydro power plants (HPPs) to hedge against deep financial losses. A HPP goal is to maximize its profit considering uncertainties in forward electricity prices, spot prices, and generation scaling factor (GSF) for years ahead. Therefore, the objective of this work is to simulate the real decision-making process of a HPP, where they need to have a perspective of the forward market and future spot price assessment to negotiate forward electricity contracts. To do so, the present work models the uncertainty in electricity forward prices via two-stage stochastic programming, assessing the benefits of the stochastic solution in comparison to the deterministic one. In addition, different risk aversion levels are assessed using conditional value at risk (CVaR). An important conclusion is that the results show that the greater the HPP risk aversion is, the greater the energy selling via electricity forward contracts. Moreover, the proposed model has benefits in comparison to a deterministic approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.