Abstract

Assumptions concerning span length and termination procedures in fault current testing of optical ground wires are examined. Peak component temperatures were measured for both 10 m and 60 m spans. The cable temperature decay time was measured and is compared with a numerical model of convection and conduction losses. A numerical model is developed to predict the peak cable tension following a hit. This model can be used to establish appropriate initial cable tensions to simulate full-span faults. The issue of dynamic stresses in the form of cable whipping is reviewed. Various cable termination procedures were tested.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.