Abstract

The screening curve method (SCM) is an intuitive and fast model that estimates the least-cost generation mix for generation planning purposes. It calculates an economically adapted generation mix for a target load duration curve within a few seconds, but lacks many detailed considerations of the generation system. In order to improve SCM, many developments have been made in recent years. However, one of the biggest limitations had always been that the SCM assumed all capacity to be new with no existing capacity. This drawback made SCM less useful compared to other generation planning models. In this paper, we develop a direct way to model existing capacity in SCM. The proposed method is studied in this paper and is illustrated with an example. Finally, an ERCOT year 2030 case is simulated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.