Abstract

Due to the increasing requirements with respect to sludge disposal, the additional waste activated sludge production of the physical-chemical or the enhanced biological phosphorus removal process is a significant factor for the overall operating costs. The main mechanisms of waste activated sludge production as a consequence of phosphorus removal for both the physical-chemical and the enhanced biological phosphorus removal process are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.