Abstract

Infrastructure projects for harnessing renewable energy (e.g., wind farm projects) have recently gained popularity because of their low adverse impact on the environment. However, it is challenging to perform risk assessments for these projects because data are either scarce or of low quality. Therefore, risk assessments for renewable energy infrastructure projects must rely on expert knowledge and can be treated as multi-criteria group decision-making (MCGDM) problems. In group decision-making problems, consensus must be built between individual decision makers who each supply their own preference indices for decision alternatives. This paper introduces a novel technique for consensus building in MCGDM problems using the principle of justifiable granularity, thereby producing an interval-valued fuzzy set that represents the aggregated value of the preference indices assigned to decision alternatives by decision makers. The preference indices obtained from each expert are realized through the analytic hierarchy process (AHP). In this paper, the introduced MCGDM technique is used to assess risk for wind farm projects. First, a context-specific work breakdown structure for wind farm projects is developed. Second, construction work packages are ranked based on how much they contribute to the overall risk or uncertainty involved in achieving the project objectives of time, cost, quality, and safety.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.