Abstract
In a companion paper, an object-oriented (OO) information model was presented for construction scheduling, cost optimization, and change order management (CONSCOM), based on the creation of a domain-specific development framework. The framework architecture is developed using generic software design elements, called patterns, which provide effective low-level solutions for creating, organizing, and maintaining objects. The OO model has been implemented in a prototype software system for management of construction projects, called CONSCOM, using the Microsoft Foundation Class library in Visual C++. CONSCOM is particularly suitable for highway construction change order management. It can be used by the owner as an intelligent decision support system in schedule reviews, progress monitoring, and cost-time trade-off analysis for change order approval. The OO information model for construction scheduling cost management can be integrated into a concurrent engineering model for the architecture, engineering, and construction industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.