Abstract

This paper presents an effective method of congestion management in power systems. Congestions or overloads in transmission network are alleviated by generation rescheduling and/or load shedding of participating generators and loads. The two conflicting objectives 1) alleviation of overload and 2) minimization of cost of operation are optimized to provide pareto-optimal solutions. A multiobjective particle swarm optimization (MOPSO) method is used to solve this complex nonlinear optimization problem. A realistic frequency and voltage dependent load flow method which considers the voltage and frequency dependence of loads and generator regulation characteristics is used to solve this problem. The proposed algorithm is tested on IEEE 30-bus system, IEEE 118-bus system, and Northern Region Electricity Board, India (NREB) 390-bus system with smooth as well as nonsmooth cost functions due to valve point loading effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.