Abstract

A congestion management approach in a deregulated electricity market using improved inertia weight particle swarm optimisation has been proposed. Firstly, the generator sensitivities are used to select the generators which would take part in the generation rescheduling and then the optimal amount of active power generation rescheduling of these selected generators are found out using improved inertia weight particle swarm optimization technique. The performance of the improved inertia weight particle swarm optimization technique in calculating generation rescheduling cost is also analysed for different values of constraint factor. The proposed methodology has been analysed on IEEE 118-bus system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.