Abstract
In this paper, restructuring of monopolistic power systems is inevitable in this day and age to cope up with the radical growth of power demand. In developed countries restructuring is already in place while developing countries are getting accustomed to it. Above and beyond the benefits to customers in terms of economy and quality, there are several challenges prevailing particularly in transmission while exercising deregulation. The foremost challenging task of Independent System Operator (ISO) is managing the transmission line congestion in a deregulated power system. In most of the congestion management techniques, only the economic aspects are considered. The minimum voltage derivation for electronic industries and acceptable voltage derivation for high power applications are considered with suitable weighting factors in the objective function.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.