Abstract

This paper proposes a novel congestion management strategy for a pool based electricity market considering combined operation of hydro and thermal generator companies. The proposed congestion management problem is formulated as mixed binary nonlinear programming problem to minimize the cost of re-dispatching the hydro and thermal generator companies to alleviate congestion subject to operational, line overloading and water availability constraints. A piecewise-linearized unit performance curve is used in this formulation, which takes into account its non-concave nature. The effectiveness of the proposed technique is demonstrated by solving the modified IEEE 57-bus and IEEE 118-bus systems for congestion management under line outages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.