Abstract
PurposeConstruction material management is an important process in supporting construction operations that affect project performance. Previous studies attempt to identify factors influencing material management in different stages such as procurement, transportation and utilization. However, they lack a model to explain the relationship between influential factors and the effectiveness of material management. Therefore, this study aims to validate the variables and key factors influencing the effectiveness of material management processes.Design/methodology/approachA total of 42 variables were reviewed from literature in different stages of material management process. Survey questionnaires were used to collect data about participants' perceptions on these variables. The respondents were 200 project engineers and project managers from construction sites and offices in Vietnam. Then factor analysis techniques were undertaken to validate the structure of factor groups. Two methods of exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) were, respectively, performed to evaluate and verify the model's fit.FindingsFactors influencing the effectiveness of material management were grouped into nine main factors, which are procurement issues, site conditions, planning and handling on site, industrial environments, contractual issues, quality control, suppliers and manufacturers' issues, transportation in and out site and security on site.Practical implicationsThe paper has several implications for theory and methodology related to material management. It features influential factors in association with the material management effectiveness. Therefore, senior managers can more fully understand the errors in their works and propose timely solutions to limit the unwanted risks.Originality/valueThis research contributes on theoretical development on factors influencing effectiveness of material management processes. The key findings on influential factors can be applied to measure the effectiveness of material management processes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Engineering, Construction and Architectural Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.