Abstract
For the quench detection, the high voltage (HV) instrumentation wires should be led out from the electrical insulation layers of ITER magnet feeders. Based on the latest design, at least four HV instrumentation wires need to penetrate from the busbar joint, which break the integrity of the intact insulation layer. A perforated crack may generate along the instrumentation wire in the insulation layer. At some specific ambient pressure and operational voltage, the crack will cause Paschen discharge inevitably, which is the most serious risk threatening the safe and steady operation of the feeders. There are over 200 busbar joints with the instrumentation wires penetration need to be manufactured on the ITER site, and a reliable and durable insulation structure and technology need to be developed for the extracting HV instrumentation wires of ITER magnet feeder. In this paper, the HV instrumentation wire extraction and the specimen design are presented. The electrical properties of the specimen, including the DC hi-pot test, Paschen test and Partial Discharge (PD) test, are reported and discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.